Client is moving to release v4.5.2 (from the ~v4.3 the overlay was built on) and wants the pin on a release NUMBER, not a raw commit. - Re-synced end-user-i18n.patch: cherry-picked PR #12558 onto v4.5.2 and resolved the ~25 conflicts from upstream's own refactors. Strategy = never break the UI: kept v4.5.2's version for tangled components (they stay English) and hand-merged only the two that matter — AppProvider (i18n init + I18nextProvider) and SettingsPage (language selector). New i18n infra + all 5 locale dicts merged cleanly. 4 files upstream relocated were dropped (no dangling imports — verified). - Pin to release tag: upstream.pinnedCommit + i18n.baseCommit = v4.5.2 (make setup checks out the tag). Regenerated patch applies to pristine v4.5.2 with zero conflicts. - apply-branding.mjs: idempotent i18n step via a sentinel file (src/lib/i18n.ts), so re-running make apply no longer errors once branding has edited the patched files. - DHI base-image swap now also triggers on v4.5.2 (its Dockerfile uses dhi.io/node). - README: tag-pin model, coverage caveat, per-release re-sync guidance. Verified: patch applies clean to v4.5.2; full make apply green (i18n + 201 code + 376 locale replacements); selector + init wired; no leaked conflict markers. Image build to be run on a stable connection (local build blocked by network). |
||
|---|---|---|
| .. | ||
| assets | ||
| i18n | ||
| templates | ||
| apply-branding.mjs | ||
| branding.config.json | ||